Day Nine, Saturday, August 28

toprest.jpg (31901 bytes)

Exhausted.  Surprised I am so tired, but it was a lot of work today. Drilled holes for the footbraces and epoxyed two layers of fiberglass tape over them. I cannot install the actual footbraces until the hull is painted because the screws that hold them in have to go over the paint.
 
meworking.jpg (14371 bytes) Epoxyed tops of deckbeams and bulkheads and had my friend Joe bend the deck over these frames while I nailed copper nails in every four inches. It was really hard.  I couldn't have done it by myself. But the deck's on!!! Will let it cure overnight, then install the coaming.  I may finish the structure tomorrow!  I've been looking into places where I can store it because if I have to lug this 15 foot boat out of my apartment every time I want to take it out, I never will. Walked down to the 79th Street Boat Basin (about 10 minutes from my apartment) and found out I can store it there (it's right next to the water) for $30 a month until October 31. Good news. And I can store it in my apartment during the winter.
 

epoxy.jpg (23531 bytes)

Epoxying again. This picture shows the messiness and cake icing-ish aspect of this task.  The bandaid on my finger covers one of a few injuries sustained during this project.  A pesky fiberglass shard.

Day 8   |   Day 10