Day 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | Sept 7-17 | Sept 18-19 | The Launch | Outings

Day Two, Wednesday, August 18

clamping.jpg (27908 bytes)

Connected 4 more strips to make 2 more long pieces which I then glued to the top hull panels. (You can't see this very well here - this may become clearer shortly!) Eventually I will nail the top of the kayak (the deck) to these strips. (half of the top of the kayak is in the background.) Notice all the clamps. I am the proud owner of about 25 c-clamps.

 

copperwire.jpg (40293 bytes)

Drilled holes in the bottom hull panels 4 inches apart and connected them with short twists of copper wire. (The process of building a kayak this way is called "stitch and glue construction.")
 

owenplans.jpg (52271 bytes)

Owen's favorite spot to lie down. Right on the plans.

Day 1     |    Day 3